Description

Core understanding
Explain A&D Airframer Master Production Scheduling (MPS) Best Practice
Generating Schedule based on formula:
Understanding of generating a schedule for a Model/Program and range of Tail #’s based on Rate/Takt and Out the Door (OTD) Dates for number of Tail’s to be generated during a period.
Generating schedule for a Model/Program with multiple Assembly Line / Production Lines within a Plant with Common Station
Generating schedule for a Model/Program on an Assembly Line / Production Line and incorporating Spares
Generating schedule for an Assembly Line / Production Line for Multiple Models/Programs
Understanding of MPS integration with Contract Line-Item Numbers (CLIN). Models with range of Tail #’s with Entry into Service Dates
Commercial utilization – integration to CRM
Defense utilization
Understanding of MPS integration with Engineering. Models with range of Tail #’s configuration (Parameter Effectivity)
Understanding of MPS integration with Assembly Processing with Parameter Effectivity
SAP knowledge
S/4 Experience
Parameter Effectivity Manufacturing Bill of Material (MBoM)
Parameter Effectivity Operative Network (Network Activities / Reference Pointers)
Standard Network (Network Activities / Reference Pointers)
Contract/Sales Orders
Consulting Skills
Requirements gathering
Functional Spec authoring
Process Flows
Functional Unit Testing
Working with Development team

Education

Any Graduate